Ningbo Hongyi Telecommunication Equipment Co.Ltd
Home > Knowledge > Content


110 IDC punch down tool installation,

Hongyi Telecom 110 IDC types Punch down tools Installation on the jumping wire blocks instrution as belows:

110 IDC punch down tool

  Step 1: For seating 110 connecting blocks without cutting wire, use the tool as is. For terminating and cutting wire, follow the next set of directions.

110 wire block

Step 2: Push terminator and blade set out of tool head body from eitherside. Separate terminator set and blade set. Rotate blade set 180º. The blades will point down at this point.

tools head

Step 3: Push the terminator head set and blade set back into tool head.

tool instruction

Step4: Attach tool head to handle and punch down.

punchdown tools

Feature and Benefit

• Cushioned rubber handle helps absorb impact to reduce hand fatigue.

• Anti-slip raised grip helps keep hand from slipping.

• Ergonomic body provides comfort.

• Compatible with ICC CAT 6, CAT 5e and voice patch panels, and CAT 6 and CAT 5e 110 wiring blocks

Ningbo Hongyi Telecommunication Equipment Co.Ltd