Ningbo Hongyi Telecommunication Equipment Co.Ltd
Tel:+86-574-63101689
ballen666@gmail.com
Home > Knowledge > Content

Knowledge

Patch panels for cat 6 instructions

INSTALLATION

1. Mount the Highspeed cat 6 Patch Panel to a standard 19˝           110 type patch panel

 equipment rack or wall-mount bracket, using the provided 

 screws.


2. Determine which color-coded wiring scheme is desired

(T568A or T568B).

NOTE: Color codes and pin numbers are located on the panel

 labels between termination (IDC) slots.


3. Remove approximately 3˝ of jacket and center spline 

from cable.110 block


4. Route jacketed wire to the termination field, so

that the jacket is near and above the IDCs.

(Figure 1) Leave sufficient flex room between

cable jacket and termination field.


CAUTION: USE OF THE 110 5-PAIR IMPACT TOOL

TO TERMINATE THE CONDUCTORS IS

NOT RECOMMENDED FOR THIS

PRODUCT.cat 5e panels


5. Use your fingers to carefully seat and secure the wires into

 the IDC slots. Maintain wire pair twisting to within 1/2˝ of the

 IDC contact. Then position a 110-style impact tool, set to low

impact, perpendicular to the IDC slot, seat and trim the cable.

NOTE: If wires appear to be "bridged" over the IDC,

rather than securely seated into the slot, pull

out the wires and reseat them. (Figure 2)


6. Attach a cable management bar to the patch

panel, using the two screws provided. (Figure 3)cat 6 patch panel

Bonding/Grounding (Earthed)

If your local code requires this patch panel to be

bonded and/or grounded, use the additional stud.

Labeling



NOTE: Additional labeling kit sold separately

.

1. Assign port designations on supplied labels.

2. Slide paper label along window feature, ensuringblob.png

the top and bottom edge are behind the guides.

(Figure 4)

3. Slide clear, plastic window over the paper label,

ensuring the top and bottom edge are behind the

guides. (Figure 5)


Ningbo Hongyi Telecommunication Equipment Co.Ltd